Building Near Town Centre Comprising 6 Flats
€253,000
Hors frais notariés, d'enregistrement et de publicité foncière.Advert Reference: 0fk9-5eb-yqt
For Sale By Agent
Agency: Promissimo
This property has been brought to you by Green-Acres
Currency Conversion provided by
Wise
| €253,000 is approximately: | |
| British Pounds: | £211,831 |
| US Dollars: | $283,182 |
| Canadian Dollars: | C$396,324 |
| Australian Dollars: | A$403,256 |
Key Info
- Type: Residential (Apartment), Business (Apartment Building / Block Of Flats)
- Bedrooms: Unknown
- Habitable Size: 347 m²
Features
- Gîte(s) / Annexe(s)
- Rental / Gîte Potential
Property Description
REF 41632 - Exclusive ORPI!
Discover this investment building near the town centre of Montluçon
This building consists of 6 well-maintained apartments (5 two-room flats and 1 three-room flat). 5 units are rented and one is vacant.
On the ground floor, 2 two-room flats: rent €495 with €35 charges.
On the first floor, 2 two-room flats: rent €550 with €35 charges.
And on the second floor, 2 flats including one two-room and one three-room: rent €495 with €35 charges.
The total surface area of this building is 350 m2 and the flats range from 54 to 72 m2.
2 flats are heated by city gas and 4 flats by electricity.
There is 1 water meter with remote reading installed in this building and each flat has its own electricity meter.
This property is located near the town centre, the hospital and the IFSI.
DPE: D/C
Contact us today for more information or to arrange a viewing.
ORPI ALLIN IMMOBILIER agency -
Agency reference: 41632
Energy Consumption (DPE)
CO2 Emissions (GES)
Currency Conversion provided by
Wise
| €253,000 is approximately: | |
| British Pounds: | £211,831 |
| US Dollars: | $283,182 |
| Canadian Dollars: | C$396,324 |
| Australian Dollars: | A$403,256 |
Location Information
For Sale By Agent
Agency: Promissimo
This property has been brought to you by Green-Acres